Project of regulation and expansion of 39 farmlands in BOKI and PAME GALLO in Senegal

The project is located in the PODOR region of the Republic of Senegal, and is divided into 39 small farmlands distributing along the Senegal River. The main project contents include field leveling of a total of 1 160 ha farmland and concrete water conservancy structures of about 7 000 m3.




Construction Site of Main Canal

Precast Yard