The project mainly contains eight power distribution rooms and control room buildings of about 5,000 m2 construction areas in five degassing stations such as AGS1 and BUN in Missan Oil Fields. The main works include the construction of buildings, steel structures, equipment’s foundations, cable trenches, fences, roads and site formation works, etc. Construction of the seperator’s foundations Building construction of control room and power distribution room