Civil Work Construction Project of Missan Oil Fields Natural Gas Treatment Plant in Iraq

The project design treatment capacity is 2,000,000 m3/d. It mainly includes six units of pressurization, desulfurization, sulfur recovery, heating, circulating water station and public control units, which are distributed in three single buildings with a total area of about 3,600 m2, as well as equipment foundations, cable trenches, roads and site formation works, etc.

Compressor foundation construction of booster unit

Precast pile construction

Heating unit, nitrogen generation unit, booster unit, sulfur unit

FCR12 and power distribution room

FAR13 Building