AFTOUT –ESSAHLI Water Supply Project LOT2A in Mauritania The main works of this Lot are construction of intake pump station and booster pump stations, include: design, construction, test, operation, Semi-industrial production and personnel training. The capacities of the 3 pump stations are 170,000m3/d, 160,000 m3/d, 150,000 m3/d.