Equipment Supply, Structures and Equipment Upgrading Project for Three Pumping Stations in Mauritania This project involves the upgrading and maintenance of three pump stations, namely Aftout, Béni Nadji, and PK17, which were constructed by our company under the Aftout Essahli Water Supply Project Lot 2A Contract between 2008 and 2011 in Mauritania. The main scope of work includes the supply and installation of the 4th pump at Béni Nadji and PK17 pump stations respectively, as well as the maintenance and commissioning of structures and equipment at the Aftout pump station. Aftout water intake pump station Maintenance of the buffer tank at Aftout pump station Installation of the 4th pump at Béni Nadji pump station Installation of the 4th pump at PK17 pump station Noise detection Pump vibration test Pump shaft and motor alignment inspection