Drinking Water Supply Project form the Well Field of Thieudeme in Senegal

Main works of the project include installation of equipment, laying of cast iron water transmission pipeline, construction of a collection tank of 1,000 m3 at the well field of Thieudeme, construction of a pump station of 750 m3/h and a ground water tank of 2,000 m3 in Bayakh, as well as necessary connections.

Bayakh 2,000 m3 water tank

Pump station and 1,000 m3 water tank

Well platform

Power distribution cabinet of pump station