Reconstruction of the Niamey network in Niger- Extension, Encryption and Reinforcement of the networks of Dosso and Tillabery The project involves the construction of 18 MV / LV distribution substations, equipped with a 400 KVA transformer each, with the associated MV / LV combined power grids in the new area of KOIRA TEGUI in Niamey, including stringing of 12 km of MV lines and 110 km of LV lines; The stringing and renewal of MV and LV lines invoving multiple areas in the urban area; In addition, there are about 60 km of MV and LV lines in the two cities of Dosso and Tillabery.